Tuesday, May 26, 2009

THE FUTURISTIC TRIO



THE TECHNICAL SPECIFICATIONS:

STORAGE TANKS & PUMPING SYSTEM
 2 Sets Vertical Type Stainless Steel Tank. 1000 liters (Raw & Product)
 1 Set Raw Water pump c/w pressure gauge, liquid level switch, Fuzzy Logic Pump Controller w/ pressure switch. Material: SUS304.
 1 Set Product Water pump c/w pressure gauge, liquid level switch, Fuzzy Logic Pump Controller w/ pressure switch. Material: SUS304.

MEDIA PRE-FILTRATION
 1 Set Pressure Type Activated Carbon Filter (FRP Φ10”XH54”) w/ SS Jacket & Programmable Automatic Multi-Port Valve.
 1 Set Pressure Type Dual Media Filter (FRP Φ10”XH54”) w/ SS Jacket & Programmable Automatic Multi-Port Valve.
 1 Set Pressure Type Ion Exchanger/Water Conditioner (FRP Φ10”XH54”) w/ SS Jacket & Programmable Automatic Multi-Port Valve. Brine tank & initial load of Australian Salt.

RO MODULE
 1 Set High Pressure Centrifugal Pump: SUS304.
 1 Set RO Vessel
 1 Pc Reverse Osmosis Membrane. HYDRANAUTICS ESPA-3 or FILMTEC 4040
 1 Set Inlet Valve: (0-10kg) 3/4”
 1 Set Flush Valve: (15kg)
 Pressure Regulator: Size :1/2” ; Material :SUS-304
 1 Set Computer Controller w/ auto-flush feature & built-in TDS Meter.
 1 Set Low Pressure Switch
 2 Sets Flowmeter (Permeate & Reject)

CARTRIDGE PRE-FILTRATION
 2 Sets Stainless Steel Filter Housing 20” slim. Material: SUS304
 2 Pcs Micro Filter 5MICRON 20” PP

CARTRIDGE POST-FILTRATION & STERILIZATION
 2 Sets Stainless Steel Filter Housing 20” slim. Material: SUS304
 1 Pc Micro Filter 5MICRON 20” PP
 1 Pc Carbon Block Cartridge 20”
 1 Set Ultraviolet System 6GPM Ultraviolet Sterilizer. SUS304

MINERAL & ALKALINE POST-FILTRATION, & STERILIZATION
 4 Sets Stainless Steel Filter Housing 10” slim. Material: SUS304
 1 Pc Micro Filter 5MICRON 10” PP
 1 Pc Carbon Block Cartridge 10”
 1 Pc Ceramic Filter & Bio-Ceramic Filter 10” slim
 1 Set Ultraviolet System 2GPM Ultraviolet Sterilizer. SUS304

ANCILLARIES
 3 Sets Gooseneck
 1 Set Pressure Washer
 Three (3) Set Pressure Gauge. 0-100kg/cm2. Material: SS304.
 One (1) Lot Mechanical Skid. SUS 202 structure to house most of the major components.
 One (1) Lot Interconnecting Pipeworks and valves: UPVC ASTM-SCH40.
 One (1) Lot Interconnecting Electrical Cables and system monitoring panel for RO Standard Operation.

IT'S ONE OF A KIND. GRAB IT NOW.
FOR MORE INQUIRIES:

PLS DON'T HESITATE TO CALL OR TEXT ME.

No comments:

Post a Comment